Jinko Solar-动态详情

尊龙凯时

Este site usa cookies para melhorar a experiência do usuário. Ao usar nosso site, você concorda com todos os cookies de acordo com nossa Política de Cookies.

Accept
Investor Relations
English

Work has been completed on a 5.24MW / 15MWh battery energy storage system for a ‘solar -plus-storage microgrid’ in Southern Japan, by GWI.

This project generated by Tiger Neo N-type TOPCon panels has incorporated into JinkoSolar’s 72 units flagship liquid cooling battery energy storage system (BESS) of up to 15MWh for a 2-hour duration. This will enable excess electricity generated by the PV facilities to be captured and released during periods of high demand. The system will also provide grid stability services and backup capacity to ensure the security of supply.

Profitability, safety, integration, and operation & maintenance (O&M) costs, are always major concerns for stakeholders when choosing an ideal C&I ESS. The SunGiga is designed for the 215kWh mainstream market, available for 2-hour and 4-hour applications. The SunGiga was jointly pre-commissioned so that all parameters were set before leaving the manufacturing base, decreasing on-site commissioning time and guaranteeing early revenue for project owners.

Legal Statement

 
All rights reserved ? 2020 Jinko Solar. 沪ICP备2022022315号-1. Privacy Policy. Powered by Webfoss.
【网站地图】【sitemap】